WHAT IS 40B
• |
Enacted in 1969, 40B is a state statute, the Comprehensive Permit Law. |
• |
Enables local Zoning Boards of Appeals (ZBA) to approve affordable housing developments under flexible rules if at least 25% of units have long-term affordability restrictions. |
WHAT IS THE INTENT OF CHAPTER 40B
• |
In 1969 – recognition that zoning practices play a role in driving up housing costs and inhibiting the broad distribution of affordable housing. |
• |
In 2004, the intent of Chapter 40B is to address the shortage of affordable housing statewide by reducing unnecessary barriers created by local zoning and other restrictions. |
BENEFITS OF CHAPTER 40B
• |
Increases the supply of low/moderate income housing |
• |
Improves regional distribution of low/moderate income housing |
• |
Allows a municipality to have town boards and committees work cooperatively and simultaneously with the local ZBA to structure a project with at least 25% affordable units. |
WHAT ARE THE BASIC REQUIREMENTS FOR 40B DEVELOPMENTS?
• |
The project must have a Project Eligibility Letter issued by a state or federal subsidy program. |
• |
The project developer must have site control Owner of Records, Purchase & Sale, or Option to Buy |
• |
At least 25% of the units in the proposed project must be restricted over time for rental by or sale to households at or below 80% of area median income |
• |
Profit is limited: the development entity must be a public agency, a nonprofit organization, or a limited dividend organization. |
PROJECT ELIGIBILITY LETTER – WHAT IS IT ????
• |
Request of the developer for subsidy |
• |
Notification by developer to DHCD of application for subsidy |
• |
Allows 30-day comment period to the subsidizing agency |
• |
“Ticket” to file a comprehensive permit |
• |
Preliminary approval of the site from the Subsidizing Agency o MassHousing o Department of Housing & Community Development o Federal Home Loan Bank • New England Fund member banks • Oversite roles is through MassHousing |
WHY ARE THE NOTICE CHANGES NECESSARY
• |
Allows stakeholders to provide feedback regarding the proposal early in process |
• |
Allows the community to obtain technical assistance at the earliest opportunity, so that it may make informed decisions. |
• |
Allows the community to designate an individual to informally discuss the project outside the ZBA hearing process. |
APPLICATION REQUIREMENT – WHAT SHOULD BE INCLUDED
• |
Site Approval Letter/Eligibility Letter |
• |
Evidence of Site Control |
• |
Preliminary Site Development Plans |
• |
Site Conditions Report |
• |
Preliminary Drawings |
• |
Building Tabulation |
• |
Subdivision Plan (if applicable) |
• |
Utilities Plan |
• |
Requested Exemptions |
|  |