Planning Board Minutes 08-15-2007
    WARE PLANNING BOARD
MINUTES
AUGUST  15, 2007
PRESENT:        Chris DiMarzio
                Ken Higney
                Joe Knapp
                Rick Staradoj

7:00            OPEN MEETING
                MINUTES OF 07-18-2007
                RESIGNATION OF JOHN CHABOT
                
                INFORMATION – DULAK – PROPERTY
                Faith and Bernie Dulak present
                Would like to buy property from abutter

Board           Would make the abutter’s lot more non-conforming – can not allow under Chapter 40


7:05            OAK HILL ESTATES SUBDIVISION
                Hearing re-opened at 7:10 pm
                John Podkowka and Bill Garrity present for Applicant

Garrity Peer Review concerns were with regard to Storm Drainage and Roadway
                We are in agreement with the concerns of the peer review
                Peer Review suggested that the Homeowners Association be responsible for
                the sanitary sewer and easement maintenance.  Garrity does not agree because
                there will not be any continuity of service.  Gibby is taking this into consideration.

A.Pelski        Abutter concerned about the Aquiver Re-Charge Protection Zone
                Is some of the property located within this zone
Garrity The existing flow of water will remain the same after property developed.
                Garrity will check with Gibby and Kevin Read about map and Aquiver.

A.Pelski        What about the water that comes down the hill?
Garrity We have met pre and post drainage calculations
                We believe the water comes from another source uphill
                We have added modifications for water retention after peer review

Starodoj        Will subdivision be built in phases or all at once ?
                If constructed in phases; a temporary cul-de-sac is required
                Applicant responsible for road repair and maintenance
                Has to have 75% build-out before top coat can be applied
                If you request lot releases, need bond or some type of performance guaranty in place.

DiMarzio        Do you expect any gravel to be taken off site?
Garrity No gravel will be removed from site
DiMarzio        There are periodic inspections and reviews required by subdivision by-law

                Possible Conditions

Please note: Once the Decision is signed and filed with the Town Clerk, that there is a twenty day appeal period, in which you or anyone else may appeal this decision. Once the appeal period is over, the Town Clerk will contact you.

The approved plans to be recorded with the Hampshire County Registry of Deeds; Proof of recording with Plan Book and Pages submitted to Planning Board Office.

Seven (7) full copies of the approved signed and recorded plan to be submitted to the Ware Planning Board Office.  The Planning Board will distribute copies to the following:

·       Building Inspector
·       Conservation Commission
·       Town Assessor’s Office
·       DPW
·       Town Clerk’s Office
·       Planning Board
·       Board of Health

Hours of Operation during Construction:
Monday – Friday    7:00 am to 6:00 pm
Saturdays              7:00 am to 3:00 pm
No Work on Sundays or Major Holidays
Major Holidays include: New Years, Memorial Day, 4th of July, Labor Day,
Columbus Day, Thanksgiving and Christmas

An As-Built Plan with all sewer connection locations submitted

Lighting at the intersections to be erected; cost of the electricity to be the responsibility of the Oak Hill Estates Homeowners Association.

Maintenance of all Detention/Retention Ponds to be the responsibility of the Oak Hill Estates  Homeowners Association.

Traffic Control Signs to be provided by the Developer in cooperation with the Town of placeCityWare.

Grading Stakes to be in place on site during all times of construction

Dust, Debris and Noise to be kept at a minimum during all construction

No gravel or soil of any kind to be removed off-site without the approval of Ware Planning Board.

Daily maintenance of roads during construction

Dust, Noise and Debris to be kept at a minimum

No Dust to leave site that will adversely affect neighbor’s property

Any damage to roads at the entrance, during the construction phase, to be repaired by applicant to the satisfaction of the stocktickerDPW Superintendent.

Maintenance of all Cisterns to be the responsibility of the Oak Hill Estates Homeowners Association.

A Maintenance Schedule of the Detention Ponds and the Cistern to be recorded at the Hampshire Country Registry of Deeds and a copy of the Maintenance Schedule to be on file with the Ware Planning Board Office, The Ware stocktickerDPW and the Ware Fire Department.

A completed copy of the Oak Hill Estates Homeowners Association to be on file with the Ware Planning Board and the original to be recorded at the Hampshire County Registry of Deeds, with proof of recording given to the Ware Planning Board.

The applicant or any future owner of this development shall, at his cost, retain the Professional Engineer of Record to perform Construction Observation services throughout the duration of construction.  Construction reports shall be provided to the Ware stocktickerDPW at all milestones of construction and, as a minimum, no less than every two weeks.

Subsequent Owners need to abide by all conditions set out in approval

Complete Compliance with Peer Review and satisfaction of DPW Superintendent

KH              MOTION TO APPROVE OAK HILL ESTATES DEFINITIVE SUBDIVISION
                BUT NOT SIGN PLANS OR FOLLOW THRU UNTIL APPLICANT GOES THRU
                WARE CONSERVATION COMMISSION
RS              SECOND
                ALL IN FAVOR
                CONTINUED TO OCTOBER 17, 2007 AT 7:05 PM


7:45            DEBBIE JACQUE – INFORMATION – DOG GROOMING – RR1
                Grooming is a SERVICE Business, which is not allowed in RR1
                Grooming Business is no boarding or overnight of animals

Board           Kennels are allowed by SP in RR1, which includes grooming
                Kennels are perpetual care of dogs

8:15            ED CAMPBELL – INFORMATION – EARTH REMOVAL – CAMPBELL ROAD
                Ed, Corrine and Rob Campbell present
                Would like to level and extend field (3.9 Acres) for Agricultural use
                Land is in Agricultural Protection

DiMarzio        Would suggest that you first check with State because you may be able to remove under Agricultural

                DISCUSSION
Board and Campbell’s discussed difference between removing gravel for agricultural use in a short period of time and removing gravel over a long period of time, selling.

Higney          Would like to see a time table and controls
                Would like to see letter from state saying incidental to agricultural use

8:15           MASONIC HALL – INFORMATION ABOUT DIVIDING PROPERTY
                Masonic Hall looking for guidance in dividing property
                Board suggested trade-off with Town of CityplaceWare to gain more frontage
                placeLot requirement is 125’ and 12,000 sf in zone

8:30            21 PLEASANT STREET – INFORMATION ABOUT CHANGE OF USE – JOY
                Joy Hinton present – property is old funeral home on corner Pleasant and addressStreetChurch St.
                Would like to convert two-family to four-family condos
                Board explained that town recognizes two-family, etc. but not condos
                Need 1 ½ parking space per unit. (parking space measures 9x12)
                Presently the house has 4 kitchens, 4 full baths and 8 exits.

Board           Advised Joy to contact Building Inspector for a walk-thru
                Perhaps it can be determined that delineation of building constitutes a 4 family
                Possibly have to file a Special Permit
                
                Joy will contact Building Inspector and return to PB on September 5, 2007

8:35            JERRY RICHARD – STRAWBERRY FIELDS – INFORMATION – LOT RELEASE
Jerry would like to build on frontage lot (addressStreet#217 Greenwich Road) but have the driveway come out onto addressStreetPenny Lane.  He would put binder coat down up to and past the lot on addressStreetPenny Lane.

Board           Advised him to check with Gibby for curb-cut
                Advised him that if he wants any lots inside the subdivision released, he will need to
                Put in a temporary cul-de-sac and base coat.

9:25            ANR – JURCZYK – WEST STREET
                Form A’s and check #4918 for $30 submitted
                Proper frontage and area and set-backs

KH              MOTION TO ENDORSE AS PRESENTED
RS              SECOND
                ALL IN FAVOR




 