Planning Board Minutes 04/18/2007
 WARE PLANNING BOARD
MINUTES OF THE MEETING
APRIL 18, 2007


PRESENT:        John Chabot
                Joe Knapp
                Rick Starodoj
                Chris DiMarzio
                Ken Higney @ 7:45 pm


7:05 pm MEETING OPENED

JC              MOTION TO APPROVE MINUTES OF 04-04-2007
RS              SECOND
                ALL IN FAVOR

                RE-ORGANIZATION OF THE BOARD
JK              MOTION TO NOMINATE CHRIS DiMARZIO AS CHAIR
JC              SECOND
                CHRIS ACCEPTED NOMINATION
                ALL IN FAVOR

JK              MOTION TO NOMINATE JOHN CHABOT AS CO-CHAIR
RS              SECOND
                JOHN ACCEPTED NOMINATION
                ALL IN FAVOR

7:10            PENNYBROOK ESTATES SUBDIVISION
                REQUEST FOR LOT RELEASE ON LOT #3
JK              MOTION TO RELEASE LOT #3
JC              SECOND
                ALL IN FAVOR

7:15            ANR - RODNEY POLLACK - ROBBINS ROAD
                ADDING 15 FEET TO HIS HOUSE LOT
                TWO FORM A'S AND CHECK #3804 FOR $30 SUBMITTED

JK              MOTION TO ENDORSE PLAN AS PRESENTED
JC              SECOND
                ALL IN FAVOR

OAK HILL ESTATES SUBDIVISION - DOANE ROAD
                
7:30            CHAIRMAN DiMARZIO OPENED THE HEARING AT 7:30 PM
                LEGAL NOTICE WAS READ INTO THE RECORD

                BILL GARRITY REPRESENTING OWNERS, JOHN & BARBARA PODKOWKA

                Preliminary  Plans were submitted in October 2006.
                65 Acres   30 Lots  single-family homes
                Will file Notice of Intent with Conservation Commission
                Submitted traffic study and sewer feasibility study
                Town Sewer, Private Water
                Town Sewer will hook up to Warebrook Village
                Road will be 28 feet with 1 foot cape cod berm on each side
                Sidewalk will be on the inside loop
                There will be three lights installed, one at each intersection and one in back.

                STORMWATER MANAGEMENT
                There are 5 detention basins
                There is 1 retention basin
                There are 2 retention swales
                All are in compliance with DEP requirements
                Will control water from roadway, rooftops and driveways

                FIRE SAFETY
                At request of Fire Chief, a 10,000 gallon pre-cast concrete cistern
                will be installed on Lot #2

                TRAFFIC
                Study was done and submitted
                Not a high traffic count on Doane Road
                Small concern with entrance point but it is best site distance for entrance
                May increase the pavement at the entrance

                QUESTIONS AND CONCERNS FROM ABUTTERS
St. George      What is minimal width of easement for sewer?

Applicant       20 feet but we are proposing 40 feet; if in future town water is
                added, then we will already have the easement.

St. George      Are all lots buildable?

Applicant       All lots meet minimum required frontage and square footage.
                DEP could deem different when we file with ConCom
Graves  Can you build on wetlands
Applicant       Subject to the jurisdiction of the Conservation Commission
Garceau Where will sewer hook up be?
Applicant       At Warebrook Village
Klassanos       There is an existing problem with water run-off onto Berkshire Circle.
                Besides the run-off from roof, driveways and road; did you take into account
                the increase in water from tree removal?  This may add to the problem down
                gradient of the site.  The stormwater system at Berkshire Drive is not adequate to handle the existing run-off.  Are there alternatives for crossings ?

Applicant       Our report covers everything.  We are clearing less than 35% of property.

Grushy  Submitted photos of recent storm and effect on Berkshire Circle.

DiMarzio        The retention / detention ponds should help with that.

Applicant       We are obligated to meet pre and post conditions.  The new run-off
                can NOT exceed existing run-off.  The pipe on Berkshire is crushed and
                the catch basin is full of debris; it is the Town's responsibility.

Pelski          What happens 5 years from now and it does get worse ?  Who is responsible ?
                The water that comes down the hill now is eroding the sand under my pool.
                Will the equipment working on project disturb existing ledge and swamp?

DiMarzio        The Engineer and Developer will be responsible.
                The Board understands this is a sensitive area
                The process for permitting is more precise, have not seen failure yet.
                Typically, retention ponds help to improve an existing problem.

8:00           RS      MOTION TO TEMPORARILY CLOSE OAK HILL HEARING
                JC      SECOND
                        ALL IN FAVOR

8:05            CHAIRMAN DiMARZIO OPENED HEARING ON SP-2007-001

RS              MOTION TO CLOSE SP-2007-001 AND RE-OPEN IN 20 MINUTES
JC              SECOND
                ALL IN FAVOR

8:05            RE-OPENED THE OAK HILL ESTATES SUBDIVISION HEARING

Klassanos       Can developer re-design the basins to retain more water upstream of
                the resource area?

Applicant       Not sure if that will achieve anything
                Horizontal increase may help but not depth

RS              Is it possible for developer to work with the Town to fix problem on
                Berkshire Circle; a compromise to make everyone happy.

Applicant       It is less expensive to do a paper study, we can't commit to this yet.

Gibby           It would be difficult to fix.  There are small 12" systems that are not adequate.
                Gibby submitted preliminary comments from the peer review.

Klassanos       Can you limit the size of the lawn to downsize the run-off ?
                When you remove trees, the impact increases run-off.

JK              MOTION TO CONTINUE TO MAY 16, 2007 AT 7:15 PM
JC              SECOND
                ALL IN FAVOR
                HEARING CLOSED AT 8:28 PM

8:30            RE-OPENED HEARING FOR SP-2007-001  KELLEY - 142 EAGLE STREET
                Applicant Kelley was present and explained project to Board.
                Wants to remove existing structures (house and garage) and rebuild
                Single-Family Home to sell.

DiMarzio        This is a non-conforming lot with non-conforming structures.
                The improvements will not be more detrimental to the neighborhood.

KH              MOTION TO APPROVE SP-2007-001
RS              SECOND
                ALL IN FAVOR

                ROLE CALL VOTE
CD              YES
KH              YES
JC              YES
JK              YES
RS              YES

8:43            ANR - CRAIG HARDER - BELCHERTOWN ROAD
                CREATING ONE NEW LOT
                PROPER AREA AND FRONTAGE
                TWO FORM A'S AND CHECK #5214 FOR $30 SUBMITTED

KH              MOTION TO ENDORSE AS PRESENTED
JC              SECOND
                ALL IN FAVOR

KH              MOTION TO ADJOURN AT 8:50
JC              SECOND
                ALL IN FAVOR






 